The Axles
Frame * Suspension * Axles * Motor * Steering * Transfer Case * Transmission * Body Tub
  * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *  
For added strength I had the axle tubes welded to the pumpkin.
Again, for added strength I had the front tubes welded too! In this photo you can also see the fitting for the ARB air line.
ARB Air Locker installed in the front with new 4.10 gears.
Detroit Soft-Locker installed in the rear with new 4.10 gears.
Superior 1-piece axles ready for installation.
The rear axle with the 1-piece axles installed. The Rubicon Express perches are not welded yet... I'm waiting to get the engine / transmission / transfer-case installed so that I can set up the pinion angle.
The rear brakes with everything installed.
Before you put them together... you have to take them apart...
A front view of the frame sitting on top of the axles.
Another view of the same...
Frame * Suspension * Axles * Motor * Steering * Transfer Case * Transmission * Body Tub